Ongoing

Project Descriptions

Girinagar is a sprawling residential area second to none,right in the heart of Kochi,the financial hub of Kerala with more than 150 residents from all walks of life.The very address in this residential colony takes you to a different plane which perhaps would be your dream,something you were aspiring for.STAVARA is building a beautiful residence in a perfect ambience just for you in this classy aristocratic Girinagar.Come to this dreamworld,together let us walk to the dream- Stavara Cornerstone.

  • Well-developed coveted residential location.
  • Only two flats in a floor.
  • Limited time Option for One Flat One Floor.
  • Rooftop Garden, Party Area, Meeting Room.
  • Ponneth Temple : 1km, Little Flower church : 1.20km
  • Giridhar Eye Research Centre: 850m
  • Kadavanthara Jn. : 800m
  • RajiveGandhi Indoor Stadium : 1.2km
  • Ernakulam Jn. : 1.8km
  • Vyttila Mobility Hub : 3.4km
  • Airport : 30.1km
  • KendriyaVidyalaya : 1.2km, BhavansVidyaMandir : 350m
  • SilverlineHospital : 600m, ATM : 400m, Supermarket : 350m

Bathroom

Flooring : Antiskid Ceramic Tile Walls : Dado with glazed tiles up to 210cms height. Plumbing : Concealed plumbing Closets : EWC Soft colored or white Health Faucet : One CP Health Faucet Water Spouts : One Hot & Cold Mixer with Spout and Shower Wash Basin : One Wash Basin with pillar cock Geyser : Provision will be provided Exhaust Fans : Provision will be provided Cockroach Trap : SS Cockroach Trap

Doors & Windows

Front Door : Teak Wood Designed Frame & Door. Internal Doors : Hard Wood Frame & Molded Skin Doors. Toilets : Molded Water Proof Fiber Frame & Doors Windows & Ventilators : UPVC/Aluminium Frame & swinging doors. MS Security Grill : Openable Wooden/UPVC Door cum Window for Balconies Locks & Hinges : Branded Locks. SS Hinges.

Electrical

Wiring : Concealed FR/HR Copper Wiring with proper earthing Mains : ELCB, MCB Energy Meter : Separate Energy Meter for apartments and common area Light & Fan Points : Ample Light & Fan Points Air conditioners : Provision for Air Conditioner in Master Bed Room Generator Backup : Generator backup for Light & Fan Points upto 300w

Flooring

Lobby & Staircase : Granite/Vitrified. Living & Dining : 60cm x 60cm Vitrified Tiles Kitchen : 60cm x 60cm Vitrified Tiles Bed Rooms & Office : 60cm x 60cm Vitrified Tiles Balconies : Terracotta/Vitrified

Lift

One Automatic Passenger Lift with adequate capacity

Security

All round Compound wall, Security Station

Water

KWA Water : Collected in Sumps and supply through overhead tanks Ground Water : Treated Ground Water supply through Sumps and Over Head Tanks.

Foundation

Foundation : RCC Piling Structure : RCC Framed Structure Masonry Partitions : Red Brick/Solid Block Plastering : Putty finish on Cement Plastering for interiors Cement Plastering for Exteriors

Kitchen & Dining

6/16Amps Power Sockets: 16W sockets 3 Nos. 6W sockets 3 Nos.Sink & Spouts:Single Bowl SS Sink for kitchen and work area.Sink Cock for Ground Water and KWA water for Kitchen.Sink cock for Ground Water for work area, if applicable.Counter:Granite counter top and Ceramic tile dado upto 60cms height. Dining Area:One Ceramic Wash Basin with a Pillar cock

Communication & Entertainment

TELEPHONE Concealed wiring for 2 Telephone sockets INTERCOM Intercom connection in apartment, security Cabin & lift. CABLE TV Concealed wiring for Cable TV/DTH in Living/Dining

ELECTRICITY

3 Phase Electric Connection with separate energy meter for 3BHK flats,Single Phase connection with separate energy meter for 2BHK flats

PAINTING

Exterior: Weather Coat Finish,Interior: Emulsion over Putty Finish,Ceiling: Emulsion over Putty Finish,Front Door : Lacquer/melamine Finish,Internal Doors : Enamel Painting,Windows & Grills: Enamel Painting for Grills.

  • Available
  • Sold
  • Booked

Other Projects